				BRAINERD LAKE DAM PROJECT UPDATE
 
 
 
July 28, 2014 
 
 
 
Stone veneer has been completed on all walls except directly adjacent to the weir and inside of the weir. The joints of the existing stone on the downstream side are complete. The vertical wall south of the culvert on the lake side was poured. | 
			 
		  |